AC Fast 24/7

E-WALD GmbH Perlesreut

Perlesreut
22kW
Max Power
1pts
Charge Points
~1–3 h
0–80 %
24/7
Open
22 kW charging speed

The E-WALD GmbH charging station in Perlesreut offers one charge point with up to 22 kW. As an AC charger, it is suitable for longer parking stops. The station is available around the clock. Charging is fee-based.

Details for charging station E-WALD GmbH Perlesreut
Operator E-WALD GmbH
ZIP / City Perlesreut
Coordinates 48.77969, 13.44451
Source osm
Charge Time Calculator 22 kW
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Nearby Charging Stations

Frequently Asked Questions

How many charge points does this station have?

This station has one charge point.

Which connectors are supported?

Connector information is not available for this station.

How long does charging take?

At 22 kW, a charge from 0 to 80 % takes approximately ~1–3 h.

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.