HPC Stadtwerke 24/7

Stadtwerke Neustrelitz Neustrelitz

Neustrelitz, Mecklenburg-Vorpommern
350kW
Max Power
2pts
Charge Points
~10–20 min.
0–80 %
24/7
Open
350 kW charging speed

The Stadtwerke Neustrelitz charging station in Neustrelitz, Mecklenburg-Vorpommern offers 2 charge points with up to 350 kW. As an HPC ultra-fast charger, it is ideal for short stops on long journeys. Supported connectors: Typ 2, Schuko. Compatible vehicles include Tesla Model 3, Tesla Model Y, Renault Zoe, BMW i3 and many more. The station is available on the Stadtwerke network around the clock. Charging is fee-based.

Details for charging station Stadtwerke Neustrelitz Neustrelitz
Operator Stadtwerke Neustrelitz
Network Stadtwerke
Connectors Typ 2, Schuko
ZIP / City Neustrelitz
State Mecklenburg-Vorpommern
Coordinates 53.36346, 13.06452
Source osm
Charge Time Calculator 350 kW
Estimated time: start % to 80 %

Compatible Electric Vehicles

Typ 2
Tesla Model 3 Tesla Model Y Renault Zoe BMW i3 Opel Corsa-e Fiat 500e Mini Electric

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Nearby Charging Stations

Frequently Asked Questions

How many charge points does this station have?

This station has 2 charge points.

Which connectors are supported?

The station supports the following connectors: Typ 2, Schuko.

How long does charging take?

At 350 kW, a charge from 0 to 80 % takes approximately ~10–20 min..

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.