AC Fast 24/7

農業部林業及自然保育署宜蘭分署

22kW
Max Power
1pts
Charge Points
~1–3 h
0–80 %
24/7
Open
22 kW charging speed

The 農業部林業及自然保育署宜蘭分署 charging station offers one charge point with up to 22 kW. As an AC charger, it is suitable for longer parking stops. The station is available around the clock. Charging is fee-based.

Details for charging station 農業部林業及自然保育署宜蘭分署
Operator 農業部林業及自然保育署宜蘭分署
Coordinates 24.49561, 121.53629
Source osm
Charge Time Calculator 22 kW
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Frequently Asked Questions

How many charge points does this station have?

This station has one charge point.

Which connectors are supported?

Connector information is not available for this station.

How long does charging take?

At 22 kW, a charge from 0 to 80 % takes approximately ~1–3 h.

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.