DC Fast 24/7

Non-Networked Portland

3250 NW Yeon Ave, Portland, OR
50kW
Max Power
1pts
Charge Points
~30–60 min.
0–80 %
24/7
Open
50 kW charging speed

The Non-Networked charging station in Portland, OR offers one charge point with up to 50 kW. As a DC fast charger, it is well-suited for quick top-ups on the road. Supported connectors: CCS (Type 1). Compatible vehicles include VW ID.4, BMW iX, Audi Q4 e-tron, Hyundai IONIQ 6 and many more. The station is available around the clock. Charging is fee-based.

Details for charging station Non-Networked Portland
Operator Non-Networked
Connectors CCS (Type 1)
Street 3250 NW Yeon Ave
ZIP / City 97210 Portland
State OR
Coordinates 45.54638, -122.70860
Source afdc
Charge Time Calculator 50 kW
Estimated time: start % to 80 %

Compatible Electric Vehicles

CCS
VW ID.4 BMW iX Audi Q4 e-tron Hyundai IONIQ 6 Skoda Enyaq Porsche Taycan Mercedes EQC Ford Mustang Mach-E

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Nearby Charging Stations

Frequently Asked Questions

How many charge points does this station have?

This station has one charge point.

Which connectors are supported?

The station supports the following connectors: CCS (Type 1).

How long does charging take?

At 50 kW, a charge from 0 to 80 % takes approximately ~30–60 min..

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.