The Stadtwerke Bad Kissingen charging station, Bayern offers 5 charge points with up to 2.3 kW. As an AC charger, it is suitable for longer parking stops. Supported connectors: Schuko. The station is available on the Stadtwerke network around the clock. Charging is fee-based.
| Operator | Stadtwerke Bad Kissingen |
|---|---|
| Network | Stadtwerke |
| Connectors | Schuko |
| State | Bayern |
| Coordinates | 50.18867, 10.06390 |
| Source | osm |
Within 500 m of this charging station
This station has 5 charge points.
The station supports the following connectors: Schuko.
At 2.3 kW, a charge from 0 to 80 % takes approximately ~3–8 h.
No, charging at this station is fee-based. Rates depend on the network operator.
This charging station is accessible 24 hours a day, 7 days a week.