The 禺快充石基站 c区 charging station offers 36 charge points with up to 22 kW. As an AC charger, it is suitable for longer parking stops. The station is available around the clock. Charging is fee-based.
| Operator | 禺快充石基站 c区 |
|---|---|
| Coordinates | 22.93868, 113.42241 |
| Source | osm |
Within 500 m of this charging station
This station has 36 charge points.
Connector information is not available for this station.
At 22 kW, a charge from 0 to 80 % takes approximately ~1–3 h.
No, charging at this station is fee-based. Rates depend on the network operator.
This charging station is accessible 24 hours a day, 7 days a week.