The Gemeinde Neckarwestheim charging station in Neckarwestheim, Baden-Württemberg offers 2 charge points with up to 7.4 kW. As an AC charger, it is suitable for longer parking stops. Supported connectors: CEE. The station is available on the Eon network around the clock. Charging is fee-based.
| Operator | Gemeinde Neckarwestheim |
|---|---|
| Network | Eon |
| Connectors | CEE |
| ZIP / City | Neckarwestheim |
| State | Baden-Württemberg |
| Coordinates | 49.04177, 9.18767 |
| Source | osm |
Within 500 m of this charging station
This station has 2 charge points.
The station supports the following connectors: CEE.
At 7.4 kW, a charge from 0 to 80 % takes approximately ~3–8 h.
No, charging at this station is fee-based. Rates depend on the network operator.
This charging station is accessible 24 hours a day, 7 days a week.