AC 24/7

Kalkar Hotel Rheinpark Vor dem Rheintor: Schuko, max 2.3 kW - 1 Charging Station

Vor dem Rheintor, Kalkar, Nordrhein-Westfalen
2.3kW
Max Power
1pts
Charge Points
~3–8 h
0–80 %
24/7
Open
2.3 kW charging speed

The Hotel Rheinpark charging station in Kalkar, Nordrhein-Westfalen offers one charge point with up to 2.3 kW. As an AC charger, it is suitable for longer parking stops. Supported connectors: Schuko. The station is available around the clock. Charging is fee-based.

Details for charging station Hotel Rheinpark
Operator Hotel Rheinpark
Connectors Schuko
Street Vor dem Rheintor
ZIP / City 46459 Kalkar
State Nordrhein-Westfalen
Charge Time Calculator 2.3 kW
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Frequently Asked Questions

How many charge points does this station have?

This station has one charge point.

Which connectors are supported?

The station supports the following connectors: Schuko.

How long does charging take?

At 2.3 kW, a charge from 0 to 80 % takes approximately ~3–8 h.

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.