Free 24/7 Free

Kalkar Grabenstraße: Schuko, max 2.3 kW - 10 Charging Stations

Grabenstraße, Kalkar, Nordrhein-Westfalen
2.3kW
Max Power
10pts
Charge Points
~3–8 h
0–80 %
24/7
Open
2.3 kW charging speed

The Stadt Kalkar charging station in Kalkar, Nordrhein-Westfalen offers 10 charge points with up to 2.3 kW. As an AC charger, it is suitable for longer parking stops. Supported connectors: Schuko. The station is available around the clock. Charging is free of charge.

Details for charging station Stadt Kalkar
Operator Stadt Kalkar
Connectors Schuko
Street Grabenstraße
ZIP / City 47546 Kalkar
State Nordrhein-Westfalen
Charge Time Calculator 2.3 kW
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Frequently Asked Questions

How many charge points does this station have?

This station has 10 charge points.

Which connectors are supported?

The station supports the following connectors: Schuko.

How long does charging take?

At 2.3 kW, a charge from 0 to 80 % takes approximately ~3–8 h.

Is charging free?

Yes, charging at this station is free of charge.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.