HPC Stadtwerke 24/7

Stadtwerke Augsburg Augsburg

Augsburg, Bayern
350kW
Max Power
4pts
Charge Points
~10–20 min.
0–80 %
24/7
Open
350 kW charging speed

The Stadtwerke Augsburg charging station in Augsburg, Bayern offers 4 charge points with up to 350 kW. As an HPC ultra-fast charger, it is ideal for short stops on long journeys. Supported connectors: Schuko. The station is available on the Stadtwerke network around the clock. Charging is fee-based.

Details for charging station Stadtwerke Augsburg Augsburg
Operator Stadtwerke Augsburg
Network Stadtwerke
Connectors Schuko
ZIP / City Augsburg
State Bayern
Coordinates 48.32426, 10.88427
Source osm
Charge Time Calculator 350 kW
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Nearby Charging Stations

Frequently Asked Questions

How many charge points does this station have?

This station has 4 charge points.

Which connectors are supported?

The station supports the following connectors: Schuko.

How long does charging take?

At 350 kW, a charge from 0 to 80 % takes approximately ~10–20 min..

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.