AC 24/7

Uwe Federholzner Rheinbach

Rheinbach, Nordrhein-Westfalen
2.5kW
Max Power
2pts
Charge Points
~3–8 h
0–80 %
24/7
Open
2.5 kW charging speed

The Uwe Federholzner charging station in Rheinbach, Nordrhein-Westfalen offers 2 charge points with up to 2.5 kW. As an AC charger, it is suitable for longer parking stops. Supported connectors: Schuko. The station is available around the clock. Charging is fee-based.

Details for charging station Uwe Federholzner Rheinbach
Operator Uwe Federholzner
Connectors Schuko
ZIP / City Rheinbach
State Nordrhein-Westfalen
Coordinates 50.63341, 6.94976
Source osm
Charge Time Calculator 2.5 kW
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Nearby Charging Stations

Frequently Asked Questions

How many charge points does this station have?

This station has 2 charge points.

Which connectors are supported?

The station supports the following connectors: Schuko.

How long does charging take?

At 2.5 kW, a charge from 0 to 80 % takes approximately ~3–8 h.

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.