Free Mer 24/7 Free

Bayreuth Handwerkskammer für Oberfranken Kerschensteinerstraße 8: Typ 2, Schuko, max 22 kW - 2 Charging Stations

Kerschensteinerstraße 8, Bayreuth, Bayern
22kW
Max Power
2pts
Charge Points
~1–3 h
0–80 %
24/7
Open
22 kW charging speed

The Handwerkskammer für Oberfranken charging station in Bayreuth, Bayern offers 2 charge points with up to 22 kW. As an AC charger, it is suitable for longer parking stops. Supported connectors: Typ 2, Schuko. Compatible vehicles include Tesla Model 3, Tesla Model Y, Renault Zoe, BMW i3 and many more. The station is available on the Mer network around the clock. Charging is free of charge.

Details for charging station Handwerkskammer für Oberfranken
Operator Handwerkskammer für Oberfranken
Network Mer
Connectors Typ 2, Schuko
Street Kerschensteinerstraße 8
ZIP / City 95448 Bayreuth
Charge Time Calculator 22 kW
—
Estimated time: start % to 80 %

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Frequently Asked Questions

How many charge points does this station have?

This station has 2 charge points.

Which connectors are supported?

The station supports the following connectors: Typ 2, Schuko.

How long does charging take?

At 22 kW, a charge from 0 to 80 % takes approximately ~1–3 h.

Is charging free?

Yes, charging at this station is free of charge.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

Always up to date

New Charging Stations & EV Tips

No spam. Only relevant updates about EVs and charging.

  • New stations nearby
  • Price changes
  • Guides and new features
The ChargeMap24 app

Find the right charging station even faster – on the road, travelling or at home.

Learn more