DC Fast Enbw 24/7

EnBW

Niedersachsen
50kW
Max Power
1pts
Charge Points
~30–60 min.
0–80 %
24/7
Open
50 kW charging speed

The EnBW charging station, Niedersachsen offers one charge point with up to 50 kW. As a DC fast charger, it is well-suited for quick top-ups on the road. Supported connectors: CCS, CHAdeMO, Typ 2. Compatible vehicles include VW ID.4, BMW iX, Audi Q4 e-tron, Hyundai IONIQ 6 and many more. The station is available on the Enbw network around the clock. Charging is fee-based.

EnBW HyperNetz is Germany's largest charging network with 1,000+ locations. The EnBW mobility+ plan significantly reduces per-kWh costs compared to the ad-hoc rate. Connectors: CCS, Type 2, CHAdeMO.

Approximate charge times at this station (0 → 80 %): VW ID.3: ~66 min, Tesla Model 3: ~85 min, BMW iX: ~125 min, Hyundai IONIQ 6: ~87 min, Renault Zoe: ~64 min. Actual times vary depending on battery temperature, state of charge and vehicle software.

The station is publicly accessible 24/7 with no advance reservation required. Charging is fee-based. GPS coordinates: 52.45925, 9.99280. Use the navigation buttons on this page to open Google Maps, Apple Maps or Waze directly.

Details for charging station EnBW
Operator EnBW
Network Enbw
Connectors CCS, CHAdeMO, Typ 2
State Niedersachsen
Coordinates 52.45925, 9.99280
Source osm
Charge Time Calculator 50 kW
Estimated time: start % to 80 %

Compatible Electric Vehicles

CCS
VW ID.4 BMW iX Audi Q4 e-tron Hyundai IONIQ 6 Skoda Enyaq Porsche Taycan Mercedes EQC Ford Mustang Mach-E
Typ 2
Tesla Model 3 Tesla Model Y Renault Zoe BMW i3 Opel Corsa-e Fiat 500e Mini Electric
CHAdeMO
Nissan Leaf Mitsubishi Outlander PHEV Kia Soul EV

Nearby Places — Take a Break

Within 500 m of this charging station

Loading nearby places...

Nearby Charging Stations

Frequently Asked Questions

How many charge points does this station have?

This station has one charge point.

Which connectors are supported?

The station supports the following connectors: CCS, CHAdeMO, Typ 2.

How long does charging take?

At 50 kW, a charge from 0 to 80 % takes approximately ~30–60 min..

Is charging free?

No, charging at this station is fee-based. Rates depend on the network operator.

When is this charging station open?

This charging station is accessible 24 hours a day, 7 days a week.

?>
Newsletter
New Charging Stations & EV Tips
No spam. Unsubscribe anytime.