The EnBW charging station, Niedersachsen offers one charge point with up to 50 kW. As a DC fast charger, it is well-suited for quick top-ups on the road. Supported connectors: CCS, CHAdeMO, Typ 2. Compatible vehicles include VW ID.4, BMW iX, Audi Q4 e-tron, Hyundai IONIQ 6 and many more. The station is available on the Enbw network around the clock. Charging is fee-based.
EnBW HyperNetz is Germany's largest charging network with 1,000+ locations. The EnBW mobility+ plan significantly reduces per-kWh costs compared to the ad-hoc rate. Connectors: CCS, Type 2, CHAdeMO.
Approximate charge times at this station (0 → 80 %): VW ID.3: ~66 min, Tesla Model 3: ~85 min, BMW iX: ~125 min, Hyundai IONIQ 6: ~87 min, Renault Zoe: ~64 min. Actual times vary depending on battery temperature, state of charge and vehicle software.
The station is publicly accessible 24/7 with no advance reservation required. Charging is fee-based. GPS coordinates: 52.45925, 9.99280. Use the navigation buttons on this page to open Google Maps, Apple Maps or Waze directly.
| Operator | EnBW |
|---|---|
| Network | Enbw |
| Connectors | CCS, CHAdeMO, Typ 2 |
| State | Niedersachsen |
| Coordinates | 52.45925, 9.99280 |
| Source | osm |
Within 500 m of this charging station
This station has one charge point.
The station supports the following connectors: CCS, CHAdeMO, Typ 2.
At 50 kW, a charge from 0 to 80 % takes approximately ~30–60 min..
No, charging at this station is fee-based. Rates depend on the network operator.
This charging station is accessible 24 hours a day, 7 days a week.